Asked | Open questions | Answered
Points Date Pair Term / Answer given Level Status Gloss
- May 17 esl>eng Piso corrido continuous-run floor pro open no
- May 7 esl>eng abatir/abatimiento to inflect/inflection pro open no
- Feb 14 esl>eng Mantenimiento conductivo periodic checklist maintenance pro closed no
- Sep 20 '23 esl>eng A casetón perdido with temporary structures formwork pro closed ok
- Apr 21 '23 esl>eng libro de obra (work)site log pro closed ok
4 Aug 26 '22 esl>eng Subcomunidad (de propietarios) sub-association (of owners) pro closed ok
- Aug 24 '22 esl>eng patrimoniales proprietary right/s pro closed ok
4 May 16 '22 esl>eng vacío sobre el apartamento stairway landing above the apartment pro closed ok
- Jan 20 '22 esl>eng días cargados days charged to an injury pro closed ok
- Dec 9 '21 esl>eng un desempeño y patio cubierto study; study room, Arg. pro closed no
- Sep 22 '21 esl>eng Superficie Bruta Construida and Superficie Bruta No Construida Gross Undeveloped Floor Area pro open no
- Jul 16 '21 esl>eng Cajón pantalla perimeter screen-wall caisson pro closed ok
- Mar 3 '21 esl>eng obras de oportunidad showcase construction projects pro closed ok
- Oct 25 '20 esl>eng Integración de ofertas Consortium pooling of /joint / tenders; incorporation of joint bids into a consortium pool pro closed ok
- Oct 2 '20 esl>eng lo hará por sus propios medios will be self-propelled pro closed ok
- Sep 14 '20 esl>eng Contrato de ejecución de obras sobre rasante Above-grade / US: at-grade / civil engineering contract pro closed ok
- Mar 19 '19 esl>eng expediente municipal Town Planning (SPA & ARG) Application (COL) Enquiry Scheme pro closed ok
Asked | Open questions | Answered