Mar 29, 2014 10:57
10 yrs ago
English term
at 0% open
English to Russian
Tech/Engineering
Petroleum Eng/Sci
gas treatment
Follow these steps when maintenance is required on an exchanger:
1. Put TIC-505A/B for the exchanger being cleaned in “Manual” at 0% open.
Increase the other TIC-505A/B controller set point.
2. Open the 10” G63PXXA bypass valve around the Feed Gas Heaters.
3. Close the 6” G33P block valve upstream of the TV-505A/B.
4. Close the 10” B63RX2A ball inlet and outlet block valves on the gas (tube) side of the exchanger.
1. Put TIC-505A/B for the exchanger being cleaned in “Manual” at 0% open.
Increase the other TIC-505A/B controller set point.
2. Open the 10” G63PXXA bypass valve around the Feed Gas Heaters.
3. Close the 6” G33P block valve upstream of the TV-505A/B.
4. Close the 10” B63RX2A ball inlet and outlet block valves on the gas (tube) side of the exchanger.
Proposed translations
(Russian)
4 | в полностью закрытое положение | Alexey Suspitsyn |
Proposed translations
19 mins
Selected
в полностью закрытое положение
+
4 KudoZ points awarded for this answer.
Comment: "Спасибо!"
Something went wrong...