Apr 9, 2003 03:11
21 yrs ago
Malay term
training report
Non-PRO
Malay to English
Tech/Engineering
enggineer
Knob insertion fixture - Bi-weekly maintenance on the pneumatic moving
mechanism, all the tube & valve are not stuck, all nuts & bolts are fully tightened and clean. Refer to IP-QSI-09-008.Describe the process in words. Include the detailed instructions which include ‘who’, ‘what’, ‘where’, ‘when’ and ‘how’. Considerations can be given to including the diagrams and pictures.
c) Top Escutcheon press fixture - Bi-weekly maintenance on the pneumatic moving mechanism, all the tube & valve are not stuck, all nuts & bolts are fully tightened and clean. Refer to IP-QSI-09-008.
mechanism, all the tube & valve are not stuck, all nuts & bolts are fully tightened and clean. Refer to IP-QSI-09-008.Describe the process in words. Include the detailed instructions which include ‘who’, ‘what’, ‘where’, ‘when’ and ‘how’. Considerations can be given to including the diagrams and pictures.
c) Top Escutcheon press fixture - Bi-weekly maintenance on the pneumatic moving mechanism, all the tube & valve are not stuck, all nuts & bolts are fully tightened and clean. Refer to IP-QSI-09-008.
Proposed translations
(English)
4 +4 | laporan latihan | Ramona Ali |
Proposed translations
+4
11 mins
Selected
laporan latihan
Is this what you need?
report - laporan
training - latihan
Adjectives appear after nouns in Malay.
report - laporan
training - latihan
Adjectives appear after nouns in Malay.
4 KudoZ points awarded for this answer.
Comment: "Graded automatically based on peer agreement. KudoZ."
Something went wrong...