Jun 8, 2019 21:00
4 yrs ago
English term
cutoff
English to Portuguese
Tech/Engineering
Astronomy & Space
NASA
https://spaceflightnow.com/2018/10/16/launch-timeline-for-at...
age and the AEHF 4 satellite into an initial parking orbit.
T+0:11:51.3: Centaur Cutoff 1
The Centaur engine shuts down after arriving in a planned low-Earth parking orbit. The vehicle enters a 10-minute coast period before arriving at the required location in space for the second burn.
age and the AEHF 4 satellite into an initial parking orbit.
T+0:11:51.3: Centaur Cutoff 1
The Centaur engine shuts down after arriving in a planned low-Earth parking orbit. The vehicle enters a 10-minute coast period before arriving at the required location in space for the second burn.
Proposed translations
(Portuguese)
4 | queima | Andrea Pilenso |
4 | desligamento do propulsor / fechamento do propulsor | Lucas Felix dos Santos |
4 | corte de combustível | Matheus Chaud |
Proposed translations
13 mins
Selected
queima
https://www.orbita.zenite.nu/satelite-secreto-lancado-desde-...
O final da primeira queima do estágio Centaur (MECO-1 – Main Engine CutOff-1) ocorre a (6) T+17m 58,1s, com o conjunto a entrar numa órbita inicial onde irá permanecer até à segunda ignição do estágio Centaur (MES-2) que ocorre a (7) T+2h 47m 52,9s.
https://www.orbita.zenite.nu/novo-satelite-meteorologico-em-...
O final da queima do estágio Atlas (Booster Engine CutOff – BECO) ocorreu a T+4m 21,8s e a separação entre o estágio Atlas e o estágio Centaur deu-se a T+4m 27,8s, com a primeira ignição do estágio Centaur (Main Engine Start – MES) a ocorrer a T+4m 37,8s. Esta primeira queima termina (Main Engine Cutoff – MECO) a T+12m 15,6s – MECO-1 ‘6’.
--------------------------------------------------
Note added at 3 días 2 horas (2019-06-11 23:29:41 GMT) Post-grading
--------------------------------------------------
Muito obrigada, Lilian!
O final da primeira queima do estágio Centaur (MECO-1 – Main Engine CutOff-1) ocorre a (6) T+17m 58,1s, com o conjunto a entrar numa órbita inicial onde irá permanecer até à segunda ignição do estágio Centaur (MES-2) que ocorre a (7) T+2h 47m 52,9s.
https://www.orbita.zenite.nu/novo-satelite-meteorologico-em-...
O final da queima do estágio Atlas (Booster Engine CutOff – BECO) ocorreu a T+4m 21,8s e a separação entre o estágio Atlas e o estágio Centaur deu-se a T+4m 27,8s, com a primeira ignição do estágio Centaur (Main Engine Start – MES) a ocorrer a T+4m 37,8s. Esta primeira queima termina (Main Engine Cutoff – MECO) a T+12m 15,6s – MECO-1 ‘6’.
--------------------------------------------------
Note added at 3 días 2 horas (2019-06-11 23:29:41 GMT) Post-grading
--------------------------------------------------
Muito obrigada, Lilian!
4 KudoZ points awarded for this answer.
Comment: "thanks"
12 mins
desligamento do propulsor / fechamento do propulsor
Duas sugestões.
https://www.proz.com/kudoz/english-to-french/aerospace-aviat...
https://en.wikipedia.org/wiki/Cutoff_(steam_engine)
https://www.proz.com/kudoz/english-to-french/aerospace-aviat...
https://en.wikipedia.org/wiki/Cutoff_(steam_engine)
2 hrs
English term (edited):
cutoff
corte de combustível
MOTORES AUTOMOTIVOS: EVOLUÇÃO, MANUTENÇÃO E TENDÊNCIAS
https://books.google.com.br/books?isbn=8539703920 - Translate this page
Funcionamento em “CutOff”:
A estratégia de “cutoff” (corte de combustível em...
https://books.google.com.br/books?isbn=8539703920 - Translate this page
Funcionamento em “CutOff”:
A estratégia de “cutoff” (corte de combustível em...
Something went wrong...