Russian term

постановка под напряжение

Russian to English Tech/Engineering Electronics / Elect Eng
Hello,
this is the title of a graphic (chart) in a report. It's about power supply, electric grids, etc.

Динамика ввода мощностей (постановка под напряжение)

I've got "capacity commissioning" from multitran for the first part. I don't understand the second part. Please only reply if you can translate technical terms or know something about this field.

thank you in advance, appreciate your help!
-Beth

Proposed translations

+1
11 hrs
Selected

energized assets

Grids/wires are getting live when they are energized, or set under voltage.
So, I would translate your diagram as 'Changes in FSK capacity additions/energized assets'
Peer comment(s):

agree Lazyt3ch
7 mins
Something went wrong...
4 KudoZ points awarded for this answer.
14 mins

start of power generation/power supply to the system

start of power generation - for generating station(s)
start of power supply to the system - for the transmitting part
Something went wrong...
33 mins

[for] the system to which voltage is applied

Alternative: [for] the subsystem to which voltage is applied.
Alternative 2: [for] the system [(or part thereof)] to which voltage is applied.
(Context is needed to select between these 3 answers.)
(Explanation for my answers here in general: It is usually desirable for a translator not to try to edit the author.)
(Incidentally, "capacity commissioning" in my opinion is incorrect for "Динамика ввода мощностей". It is out of context and unidiomatic. I would suggest (again trying not to edit the author): "Dynamics of power input". "Мощность" means "power" in the present context, not "capacity".
Note from asker:
Ok, so постановка is either system or subsystem, correct? Both your answer and the other so far are helpful and seem to confirm that.
Something went wrong...
+1
8 hrs

connection to the grid

FSK - Annual Report 2015 - Инвестиции в развитие электросетевой инфраструктуры
http://report2015.fsk-ees.ru/reports/fsk/annual/2015/gb/Russ...

See the diagram “Динамика ввода мощностей ФСК (постановка под напряжение)”

Here’s a direct link to the diagram:
http://report2015.fsk-ees.ru/fsk/annual/2015/gb/layout/pic/6...

== BEGIN QUOTE ==

Транформаторная мощность, тыс. МВА

Линии электропередачи, тыс. км

== END QUOTE ==
Peer comment(s):

agree valeriu bosneaga : and for the first term I would propose "Capacity commissioning rate"
2 hrs
Thank you!
Something went wrong...
9 hrs

voltage production

Something went wrong...