Dec 25, 2017 14:29
6 yrs ago
English term

SC

English to Arabic Tech/Engineering Electronics / Elect Eng
1. The temperature of accessible surfaces may be high when the appliance is operating.
2. The surfaces are liable to get hot during use.
3. If the supply cord is damaged, it must be replaced by the manufacturer, its service agent or similarly qualified persons in order to avoid a hazard



If the supply cord is damaged, it must be replaced by the manufacturer, its service agent or similarly qualified persons in order to avoid a hazard
Replace the SC details with latest one provided By Mr. xxx ( Arabic version attached FYR)



– the iron must not be left unattended while it is connected to the supply mains
– the plug must be removed from the socket-outlet before the water reservoir is filled with water

Proposed translations

11 mins
Selected

سلك الشحن

Supply cord

--------------------------------------------------
Note added at 13 mins (2017-12-25 14:42:44 GMT)
--------------------------------------------------

سلك تجهيز الكهرباء
Something went wrong...
4 KudoZ points awarded for this answer.
7 hrs

كابل/سلك التوصيل

كابل/سلك التوصيل (الكهربائي)ـ
Something went wrong...
2 days 6 hrs

سلك الإمداد /التزويد بالكهرباء

الحديث عن السك الذي يزود المكوى بالكهرباء
Something went wrong...
Term search
  • All of ProZ.com
  • Term search
  • Jobs
  • Forums
  • Multiple search