AMMONIA PLANT
OPERATING MANUAL
Purifier cool-down
...
Purifier package cool-down shall start immediately following the completion of all process gas side dry-out activities.
- Using the purifier product gas pressurizing by-pass pressurize the purifier inlet & product gas sides backwards to match the plant front-end pressure
- Maintain the molecular sieve drier regeneration gas source located at the drier process gas outlet
- After equalizing the purifier package process gas side pressure to the plant front-end pressure using XXX fully open the purifier inlet gas YYy, using ZZZ fully open the purifier product gas AAA, and close the associated pressurizing bypass valves
- While monitoring all plant front-end conditions using BBB gradually close the purifier package process gas side bypass CCC
- Prepare the expander and generator for start-up
- Start the expander oil system and using nitrogen from the nitrogen distribution system immediately establish an expander seal gas flow
- After stabilizing both the expander oil and seal gas systems switch the expander seal gas source ***to be process gas taken*** from immediately upstream of the purifier package inlet and manually isolate the nitrogen supply to the seal gas system
Не могу понять часть: "switch the expander seal gas source ***to be process gas taken*** from immediately upstream ..."
переключите линию так, чтобы источником уплотняющего газа детандера был технологический газ, забираемый непосредственно.."
Прошу прощения, если звучит как бред...
Спасибо
OPERATING MANUAL
Purifier cool-down
...
Purifier package cool-down shall start immediately following the completion of all process gas side dry-out activities.
- Using the purifier product gas pressurizing by-pass pressurize the purifier inlet & product gas sides backwards to match the plant front-end pressure
- Maintain the molecular sieve drier regeneration gas source located at the drier process gas outlet
- After equalizing the purifier package process gas side pressure to the plant front-end pressure using XXX fully open the purifier inlet gas YYy, using ZZZ fully open the purifier product gas AAA, and close the associated pressurizing bypass valves
- While monitoring all plant front-end conditions using BBB gradually close the purifier package process gas side bypass CCC
- Prepare the expander and generator for start-up
- Start the expander oil system and using nitrogen from the nitrogen distribution system immediately establish an expander seal gas flow
- After stabilizing both the expander oil and seal gas systems switch the expander seal gas source ***to be process gas taken*** from immediately upstream of the purifier package inlet and manually isolate the nitrogen supply to the seal gas system
Не могу понять часть: "switch the expander seal gas source ***to be process gas taken*** from immediately upstream ..."
переключите линию так, чтобы источником уплотняющего газа детандера был технологический газ, забираемый непосредственно.."
Прошу прощения, если звучит как бред...
Спасибо
Proposed translations
(Russian)
3 | переключите систему уплотнительного газа детандера на технологический газ... | Roman Karabaev |
Proposed translations
25 mins
Selected
переключите систему уплотнительного газа детандера на технологический газ...
Ну то есть при запуске к уплотнениям детандера подают азот от отдельного источника, а теперь необходимо перевести уплотнения на технологический газ, который откуда-то там забирают.
Может быть еще можно написать что-то вроде "переведите питание уплотнений детандера на технологический газ".
Может быть еще можно написать что-то вроде "переведите питание уплотнений детандера на технологический газ".
4 KudoZ points awarded for this answer.
Comment: "Благодарю."