GLOSSARY ENTRY (DERIVED FROM QUESTION BELOW) | ||||||
---|---|---|---|---|---|---|
|
10:39 Jun 8, 2016 |
Serbian to English translations [PRO] Tech/Engineering - Engineering (general) / Anaerobno postrojenje (pivara) | |||||||
---|---|---|---|---|---|---|---|
|
| ||||||
| Selected response from: Natasa Stankovic Serbia Local time: 08:24 | ||||||
Grading comment
|
Summary of answers provided | ||||
---|---|---|---|---|
4 | process fluid pipework/network |
|
process fluid pipework/network Explanation: Over 100,000 Micro Motion Coriolis meters are installed in food and beverage plants globally. - Industries such as dairy, baking, beverages, grains/oils and brewing - Applications such as batching, blending, distillation and custody transfer - Process fluids ranging from water, milk, syrups, meat slurries and gases Encyclopaedia of Brewing - A buffer tank is one that is located in a process stream for the temporary holding of process fluids. Its use, as the name suggests, is to serve as a means of balancing flows and preventing sudden changes in pressure. Thus, buffer tanks are used where the rate of forward flows of fluids into and out of individual pieces of process plant might be different. https://books.google.rs/books?id=fctJLwKUzX4C&pg=PT189&lpg=P... These show that both the total and process fluid piping system distributions are broadly consistent with the Hooper valve/pipe length distributions. If the inventory figures are compared it is apparent that the process fluid pipework is more complex for the smaller diameters than is the total piping. https://dspace.lboro.ac.uk/dspace-jspui/bitstream/2134/11945... B. Vukičević - Građevinski rečnik: cevna mreža - pipework -------------------------------------------------- Note added at 5 hrs (2016-06-08 16:17:12 GMT) -------------------------------------------------- Ili samo: process pipework Brewery Musk Equipment and Systems: - Process pipework – including pumps and valves http://musk-eng.co.uk/market-sectors/brewery-distillery/ Wadworth Brewery Phase 1 and 2 (4th April 2009) - New Process Pipework and Equipment Design/Installation http://www.abm.ltd.uk/article.php?from=2&id=7 |
| |
Grading comment
| ||
Login to enter a peer comment (or grade) |
Login or register (free and only takes a few minutes) to participate in this question.
You will also have access to many other tools and opportunities designed for those who have language-related jobs (or are passionate about them). Participation is free and the site has a strict confidentiality policy.